Home Outdoor Sports FAQS Fishing Golf swimming Skiing and Skating Cycling Climbing Other Outdoor Sports Camping
Swimming Articles  Outdoor sports > Swimming > Swimming Articles > How Swimming Pool Contractors Georgia Do Their Work

How Swimming Pool Contractors Georgia Do Their Work

2016/7/21 15:28:01


Construction of a swimming pond is done in stages. Swimming pool contractors Georgia follow well predetermined processes while constructing a pond. The processes have been used many times and given excellent results. Failure to follow this sequence could produce poor results that would make the owners very disappointed.

The blueprint of such a job is very important. A designer can come up with nice plans of swimming ponds that can be implemented. This can also include the average cost to be incurred. Other people will borrow designs from their friends and use them for construction. AS long as the owners are happy with a design, then the work can move to the next step.

Different places are governed by laws and guidelines. These are meant to ensure the safety of the citizens as well as maintaining order. Any laws that govern the construction industry must be adhered to. Permission to go ahead with the construction plans should be obtained from the relevant offices. This procedure could take long due to the many requests made for permits.

A lay out is done in the exact location and shape the pool will be. Workers use the lay out to know where to dig as they prepare the depth and width of the pool. The length of the structure is also determined by the same layout. Soil excavation begins almost immediately after laying out of the plan is over. Heavy machinery may be a bit hard to maneuver within the compound without damaging other structures. Therefore, smaller heavy duty equipment are used.

Next the steel bars are placed into the hole which has just been dug up. The bars are used to enhance strength of the structure. They are placed at right angles to each other. This means that they cross each other at ninety degrees. Immediately after this, the plumbing work is installed.

Concrete is a good and durable material for construction of many structures. It is also used to make swimming ponds. To increase its strength, it is poured under pressure. This makes it more compact and resistant to damage due to compressive forces. There are certain guidelines about the thickness of the concrete which are also followed. The floor is usually thicker than the walls.

When the concrete is ready, tiles can be put in place. The tiles used are selected by the owners. They could be big or small and also of different shapes and colors. Some times a designer can help to narrow down the options for the owners so that it is less confusing for them to make a choice.

Plumbing work is completed by an expert who ensures that the water pumping and filtration systems are working well. If heating systems are to be used, then they too are installed. All lights for the pool are also fixed.

The platforms adjacent to the pond are also decorated. They should be in harmony with the pool's design so as to give it a beautiful blend. The deck should also blend in with the house. Any debris which has resulted from the construction work is collected and disposed off properly. The owners are instructed on how to care for the pond and officially handed the pool.





  1. Prev:
  2. Next:

Contact management E-mail : [email protected]

Copyright © 2005-2016 Outdoor sports All Rights Reserved